Industry shipping guides: equipment and parts from China

Generic freight advice breaks down when the cargo is non-stackable, precision-built, or needed on a production line next week. These guides cover the three equipment categories I deal with most often, with the checks that actually determine whether a plan works.

Every industry page follows the same structure: what makes this type of cargo different, what has to be confirmed before booking, how to compare the transport options honestly, and which details most often delay a shipment.

⚙️

Automotive parts

Urgent production requirements, ocean freight schedule risk, and how to evaluate air freight when a line is about to stop.

Read the automotive guide →
🖨️

3D printing equipment

Oversized and precision-built machines: packing to survive the trip, disassembly risk, export documentation and landed-cost planning.

Read the 3D printing guide →
❄️

HVAC equipment

Multi-supplier consolidation, mixed Incoterms, non-stackable units and the LCL-versus-FCL decision that decides the final cost.

Read the HVAC guide →

Why industry-specific planning matters

Two shipments of the same weight and volume can behave completely differently. An automotive aftermarket part can usually be palletised, stacked and shipped like general cargo. A gantry machining centre cannot. An industrial 3D printer may contain precision rails that tolerate almost no impact, and its resin or powder consumables may change which carriers will accept the booking at all.

What changes between industries is rarely the freight rate structure. It's the set of constraints — footprint, centre of gravity, fragility, whether units can be stacked, whether disassembly is permitted, and what documentation the destination requires. Those constraints decide whether you're shipping one FCL, several LCL lots, or air freight.

The checks that apply to all three

  1. Get real packed dimensions, not product specs. Crate, pallet and packaging add size. A machine that fits a container on paper often doesn't once it is crated.
  2. Confirm whether anything can be stacked. This single answer determines usable floor area, and therefore whether LCL is even viable.
  3. Confirm supplier locations and Incoterms. Multiple suppliers under EXW, FOB and FCA create different pickup and cost-allocation questions before the cargo ever meets.
  4. Confirm cargo-ready dates per supplier. A container that waits for the last supplier still accrues equipment and storage costs.
  5. Check for regulated content — batteries, resins, powders, aerosols, lubricants — and ask the carrier what documentation it actually requires.
Use the calculator first. Before requesting rates on equipment cargo, run the numbers through the container loading calculator to see whether the cartons or crates physically fit a 20GP, 40GP or 40HQ container, and whether payload or door dimensions rule a size out.

Common questions

Can you handle equipment that needs a crane or special loading?

Loading method depends on the cargo's weight, footprint and the handling equipment available at the pickup and destination sites. This is one of the first things I ask about, because it can rule a shipping option out before rates matter. Whether a specific method is available is confirmed per shipment with the service providers involved.

Do you only work with importers, or also with overseas forwarders?

Both. Overseas forwarders who need China-side coordination are a large part of the work, alongside importers, exporters and manufacturers shipping their own equipment.

Where should I start if I don't know which method is right?

Send the commodity, packed dimensions, weight, supplier locations, cargo-ready date and destination. Those six items are usually enough to shortlist the realistic options — and to say clearly which ones should be ruled out.

Tell us what you're shipping and where it has to be

Packed dimensions, weight, supplier locations, cargo-ready date and destination are usually enough to shortlist the realistic options — and to rule out the ones that will not work.